Hurricane Milton – PinCo ACS IAP for Operational Period Two

The PinCo ACS Incident Action Plan for Operational Period Two is now available at the link shown below.

Radio operators are still need to support our evacuation shelters. Please contact Mike Drake, WA1RYQ, at 727-215-6352 if you are available to help.

Leave a Reply